contact us
  • Guangzhou XuCheng Electronic Technology Co.,Ltd.


    Contact:katherine

    Mobile: +86-13926166152

    Email:katherine214ling@gmail.com 

                katherine_119ling@chinaxuli.net


    Tel: 020-39294733

    Website: www.chinaxuli.net

    Add:No.3 Haichong Road, Guannanyong Development Zone,Shiqi Town, Panyu, Guangzhou, China

新闻详细
  • Xu Li piezoelectric photo machine nozzle installation steps - Guangzhou Asahi Electronic Technology Co., Ltd.
    新闻分类:company news   作者:admin    发布于:2015-05-234    文字:【】【】【


    Xu Li expensive piezoelectric photo machine heads because users often caused by improper installation of sprinklers does not work properly, causing serious damage to the nozzle or nozzles cause void, in order to bring unnecessary economic losses. Following Xiaobian finishing on Guangzhou Xu Xu Li into electronic piezoelectric photo machine nozzle installation step of the process we hope to help everyone (for reference).

     

    The following is the correct installation steps:

     

    1, before installation to ensure that the ground Xu Li piezoelectric photo machine is connected properly, and the nozzle of the supply voltage is normal. We need to use this time to look at whether there meter on the main components electrostatically. Five Epson nozzle supply voltage is typically 42V DC!

     

    2, then using software to test to see if Xu Li piezoelectric photo machine to work properly, view raster reading is not normal, whether the indicator is on. In addition, the operator's hands to be dried, can not have sweat or water vapor, if the hand is wet easily cause a short circuit caused by touching the nozzle line. Also remember not to wear plastic sheeting class easy to play static clothing.

     

    3. Check the Electronic Technology Co., Ltd. Guangzhou Xu Xu Li piezoelectric photo machine nozzle data line, there is no tilt pins, conditions would be best to use the new plug wire, then plug wire inserted in the nozzle, be careful not to tilt. Line head nozzle on normally marked with positive and negative, there is one side to the contact lines, the other side is not touching the line, so be sure to pay attention to the direction of not a mistake. After careful examination to be plugged in, to ensure accuracy and then install sprinklers after the small frame above.

     

    4. After the nozzle is installed to repeatedly check 3-5 times to ensure that there is no problem and then turn on the power, this time it is best not to open the nozzle, first with the ink primer over the jet pump, and then turn the power nozzle, which If the flash when the normal spray painting installation instructions correctly. If flash spray is not normal, it must immediately disconnect the power, to see why other areas.

    Guangzhou Asahi Electronic Technology Co., Ltd. always uphold the integrity and help customers, persist in using their services to impress customers. If in doubt please call Xu Li pictorial National Service Hotline: 4009-611-106

    Guangzhou Asahi Electronic Technology Co., Ltd.


    分享到:
    点击次数:2327  更新时间:2015-05-23  【打印此页】  【关闭



Copyright © 2015 Guangzhou XuCheng Electronic Technology Co.,Ltd.  digital inkjet printer(Eco solvent)  Aurora photo machine   

Add: the 3rd Uncle Road Shiji Village, Panyu District, Guangzhou City, Guangdong Province, Shiji Town official South Wing Zone